Title | Causes of variation orders in construction projects in the Gaza Strip |
---|---|
Untitled | |
Abstract |
The maximum project performance would be achieved if the work invariably flows smoothly within time limits and anticipated budget. Variation orders result in time delay, cost overrun, quality defects, and other negative impacts. This is common in construction projects in Gaza Strip. The main objective of this study was to analyze the causes of variation orders in construction projects in Gaza Strip. The causes of variation orders in construction process in Gaza Strip were investigated through questionnaire survey of 36 classified construction companies, 25 consultants and 15 owners. 64 causes of variation orders were identified from literature review. The study results identified the top ten most important factors that include lack of materials and equipment spare parts due to closure, change in design by consultant, lack of consultant's knowledge of available materials, errors and omission in design, conflicts between … |
Type | Journal Article |
Date | 2010 |
Published in | Journal of Civil Engineering and Management |
Series | Volume: 16, Number: 4 |
Publisher | Taylor & Francis Group |
Citation | |
Item link | Item Link |
License | ![]() |
Collections | |
Files in this item | ||
---|---|---|
There are no files associated with this item. |