• العربية
    • English
  • English 
    • العربية
    • English
  • Login
Home
Publisher PoliciesTerms of InterestHelp Videos
Submit Thesis
IntroductionIUGSpace Policies
JavaScript is disabled for your browser. Some features of this site may not work without it.
View Item 
  •   Home
  • Faculty of Engineering
  • PhD and MSc Theses- Faculty of Engineering
  • View Item
  •   Home
  • Faculty of Engineering
  • PhD and MSc Theses- Faculty of Engineering
  • View Item

Please use this identifier to cite or link to this item:

http://hdl.handle.net/20.500.12358/19049
TitleDevelopment of a New Delay Analysis Method that Considering Schedule Updates and Resource Over Allocation
Title in Arabicتطوير طريقة جديدة لتحليل التاخير تراعي تحديثات الجدول الزمني والتخصيص الزائد للمصادر
Abstract

Due to the inherent risks and increasing complexity of modern construction projects, delays and cost overruns have become common facts in the industry. Researchers and practitioners have used many techniques to assess project delays and apportion delay responsibility among the parties involved. Windows delay analysis has been recognized as one of the most credible techniques for analyzing construction delays. Despite its benefits, windows analysis can produce different results depending on the window size, it does not consider owner and contractor acceleration, it does not systematically consider the impact of several schedule updates made due to changes in the duration and logical relationships of the activities, and it does not consider the impact of the progress events on resource over-allocation and its consequent delays. This study proposes a new schedule analysis model that considers multiple schedule updates and resource over-allocation. The model uses a daily window size in order to consider all fluctuations in the critical path(s) and uses a legible representation of progress information to accurately apportion delays and accelerations among project parties. A simple case study has been demonstrated on the proposed delay analysis model in order to validate its accuracy and usefulness. To facilitate its use, the study has been introduced detailed procedures to make the control process on the scheduling and resource management through the project period is easy process.

Authors
Jendeya, Ihab Ryad Sady
Supervisors
Rustom, Rifat
Typeرسالة ماجستير
Date2009
LanguageEnglish
Publisherthe islamic university
Citation
License
Collections
  • PhD and MSc Theses- Faculty of Engineering [641]
Files in this item
file_1.pdf1.863Mb
Thumbnail

The institutional repository of the Islamic University of Gaza was established as part of the ROMOR project that has been co-funded with support from the European Commission under the ERASMUS + European programme. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Contact Us | Send Feedback
 

 

Browse

All of IUGSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsSupervisorsThis CollectionBy Issue DateAuthorsTitlesSubjectsSupervisors

My Account

LoginRegister

Statistics

View Usage Statistics

The institutional repository of the Islamic University of Gaza was established as part of the ROMOR project that has been co-funded with support from the European Commission under the ERASMUS + European programme. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Contact Us | Send Feedback