Now showing items 1-2 of 2

    • Thumbnail

      Cost Estimation Practice in the Gaza Strip: A Case Study

      Enshassi, Adnan; Madi, Ibrahim M.; Mohamed, Sherif (الجامعة الإسلامية - غزة, 2007)
      The construction sector has a strategic role in developed and developing countries. Employing more than 16 per cent of Palestinian work force, the sector is the largest industrial employer in Palestine. The construction ...
    • Thumbnail

      Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip

      Enshassi, Adnan; Mohamed, Sherif; Abdel-Hadi, Munther (Universiti Sains Malaysia Press, 2013)
      Pre-tender cost estimates of construction projects require extensive knowledge and expertise. The aim of this paper is to identify, evaluate and rank essential factors affecting the accuracy of pre-tender cost estimating ...