• العربية
    • English
  • English 
    • العربية
    • English
  • Login
Home
Publisher PoliciesTerms of InterestHelp Videos
Submit Thesis
IntroductionIUGSpace Policies
JavaScript is disabled for your browser. Some features of this site may not work without it.
View Item 
  •   Home
  • Faculty of Engineering
  • Staff Publications- Faculty of Engineering
  • View Item
  •   Home
  • Faculty of Engineering
  • Staff Publications- Faculty of Engineering
  • View Item

Please use this identifier to cite or link to this item:

http://hdl.handle.net/20.500.12358/26528
TitleUsing a situation analysis to identify the construction industry deficiencies in Botswana
Untitled
Abstract

This paper reports the results of a multi-phase study aimed at identifying ways of transforming the construction industry in Botswana into an efficient, effective and sustainable sector. The study examined a number of reports indicating that public construction projects were not delivered as contractually expected. The first phase of the study, a situation analysis, was divided into two stages, with the first validating the claims that projects perform poorly in terms of both time and cost. Project data were compiled and analysed by computing the cost and time variances. The second stage solicited the opinions of various industry stakeholders regarding the deficiencies in the industry that led to poor project performance. Based on 323 sampled public construction projects, the results indicated that 13% had been abandoned and retendered. For those projects not abandoned, 52% and 75% had cost and time overruns, respectively. On average, the amount of cost overruns was 15% while the amount of time overruns was 75%. This level of performance is considered worrisome if allowed to continue. Causes of the overruns were identified as emanating from the decisions and actions of clients, suppliers, and regulators as well as the lack of a coherent facilitation of the construction business environment. The latter was singled out as an urgent challenge that needs addressing if the construction industry is to exist as a sustainable sector in Botswana. Though the concept of construction industry development is not new, this paper underscores that situations for each country are different and models that aim to transform an industry must look at the underlying …

Authors
Ssegawa-Kaggwa, Joseph
Ngowi, Alfred B
Ntshwene, Keneilwe
TypeJournal Article
Date2013
Subjects
situation analysis
development
transformation
botswana
construction industry
Published inJournal of Construction in Developing Countries
SeriesVolume: 18, Number: 1
PublisherUniversiti Sains Malaysia Press
Citation
Item linkItem Link
License
Collections
  • Staff Publications- Faculty of Engineering [908]
Files in this item
Enshassi, Adnan_49.pdf469.7Kb
Thumbnail

The institutional repository of the Islamic University of Gaza was established as part of the ROMOR project that has been co-funded with support from the European Commission under the ERASMUS + European programme. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Contact Us | Send Feedback
 

 

Browse

All of IUGSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsSupervisorsThis CollectionBy Issue DateAuthorsTitlesSubjectsSupervisors

My Account

LoginRegister

Statistics

View Usage Statistics

The institutional repository of the Islamic University of Gaza was established as part of the ROMOR project that has been co-funded with support from the European Commission under the ERASMUS + European programme. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Contact Us | Send Feedback