• العربية
    • English
  • English 
    • العربية
    • English
  • Login
Home
Publisher PoliciesTerms of InterestHelp Videos
Submit Thesis
IntroductionIUGSpace Policies
JavaScript is disabled for your browser. Some features of this site may not work without it.
View Item 
  •   Home
  • Faculty of Engineering
  • Staff Publications- Faculty of Engineering
  • View Item
  •   Home
  • Faculty of Engineering
  • Staff Publications- Faculty of Engineering
  • View Item

Please use this identifier to cite or link to this item:

http://hdl.handle.net/20.500.12358/23349
TitleCost Estimation Practice in the Gaza Strip: A Case Study
Untitled
Abstract

The construction sector has a strategic role in developed and developing countries. Employing more than 16 per cent of Palestinian work force, the sector is the largest industrial employer in Palestine. The construction industry accounts for 17 per cent of the value added to the gross national product. Cost estimation is a fundamental part of the construction practice as it represents the compilation and analysis of many items that influence, and contribute to, the total cost of project. The aim of this paper is to present a practical case study on cost estimation practice of a construction project implemented by a local contractor while project clients’ was the United Nations Relief and Works Agency (UNRWA). The findings obtained from the case study showed that the most five important factors that affect contractors’ cost estimate are financial status of owner, type of project, contractor workload, location of project, and method of paying Value Added Tax (VAT). Excluding VAT from the quotation analysis sheet will provide more accurate and obvious bid estimates. Therefore, clients and owners are encouraged to advertise their projects based on zero VAT rating. The results of this study recommend that there is a need to change the traditional awarding system for contracts from the first lowest bidder to the most accurate one.

Authors
Enshassi, Adnan
Madi, Ibrahim M.
Mohamed, Sherif
TypeJournal Article
Date2007
LanguageEnglish
Subjects
accuracy
keyword: cost estimation
contractors
economy
Published inIUG Journal for Natural and Engineering Studies
SeriesVolume: 15, Number: 2
Publisherالجامعة الإسلامية - غزة
Citation
License
Collections
  • Staff Publications- Faculty of Engineering [908]
Files in this item
156-444-1-PB.pdf192.9Kb
Thumbnail

The institutional repository of the Islamic University of Gaza was established as part of the ROMOR project that has been co-funded with support from the European Commission under the ERASMUS + European programme. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Contact Us | Send Feedback
 

 

Browse

All of IUGSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsSupervisorsThis CollectionBy Issue DateAuthorsTitlesSubjectsSupervisors

My Account

LoginRegister

Statistics

View Usage Statistics

The institutional repository of the Islamic University of Gaza was established as part of the ROMOR project that has been co-funded with support from the European Commission under the ERASMUS + European programme. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Contact Us | Send Feedback